Hot New Products Vision Measuring Machine Suppliers - Horizontal instant vision measuring machine – Handing

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

In the past few years, our company absorbed and digested advanced technologies both at home and abroad. Meanwhile, our company staffs a team of experts devoted to the development of 3d Optical Measurement System, Linear Grating Scale, Optical Position Encoder, Create Values,Serving Customer! would be the purpose we pursue. We sincerely hope that all clients will build long-lasting and mutually effective cooperation with us.In the event you wish to get extra facts about our enterprise, Be sure to get in touch with with us now.
Hot New Products Vision Measuring Machine Suppliers - Horizontal instant vision measuring machine – Handing Detail:

Model

HD-100H

CCD 20 Million pixel industrial camera
Lens Ultra-clear bi-telecentric lens
Light source system Telecentric parallel contour light and ring-shaped surface light.
Z-axis movement mode

3KG

Load-bearing capacity

Φ100mm(The measurable range is 100×75mm)

Visual field

±2μm

Repeatability accuracy

±5μm

Measurement accuracy

IVM-2.0

Measurement software It can measure single or multiple products at the same time
Measurement mode

1-3S/100pieces

Measurement speed

AC220V/50Hz,300W

Power supply

Temperature: 22℃±3℃  Humidity: 50~70%

Vibration: <0.002mm/s, <15Hz

Operating environment

35KG

Weight

12months

How long does your normal product delivery time take?

Assembly time: Linear encoders are in stock, 3 days for manual machines, 5 days for automatic machines, 25-30 days for large stroke machines.

Are your products traceable? If so, how is it implemented?

Each of our equipment has the following information when it leaves the factory: production number, production date, inspector and other traceability information.

What is your production process?

Receiving orders – purchasing materials – full inspection of incoming materials – mechanical assembly – performance testing – shipping.

What is the average lead time?

For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times become effective when (1) we have received your deposit, and (2) we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so.

What is the product warranty?

We warranty our materials and workmanship. Our commitment is to your satisfaction with our products. In warranty or not, it is the culture of our company to address and resolve all customer issues to everyone’s satisfaction.


Product detail pictures:

Hot New Products Vision Measuring Machine Suppliers - Horizontal instant vision measuring machine – Handing detail pictures

Hot New Products Vision Measuring Machine Suppliers - Horizontal instant vision measuring machine – Handing detail pictures

Hot New Products Vision Measuring Machine Suppliers - Horizontal instant vision measuring machine – Handing detail pictures


Related Product Guide:

That has a sound business credit history, outstanding after-sales service and modern producing facilities, we have earned an superb popularity amid our buyers across the planet for Hot New Products Vision Measuring Machine Suppliers - Horizontal instant vision measuring machine – Handing , The product will supply to all over the world, such as: Mali, Angola, Estonia, We guarantee that our company will try our to reduce customer purchase cost , shorten the period of purchase , stable merchandise quality , increase customers' satisfaction and achieve win-win situation .
  • Cooperate with you every time is very successful, very happy. Hope that we can have more cooperation!
    5 Stars By Rose from Ireland - 2017.12.31 14:53
    It is really lucky to meet such a good supplier, this is our satisfied cooperation, I think we will work again!
    5 Stars By Carol from Karachi - 2017.01.11 17:15
    Write your message here and send it to us