Factory Price For Manual Vision Measurement Systems - Horizontal instant vision measuring machine – Handing

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

With a complete scientific quality management system, good quality and good faith, we win good reputation and occupied this field for Multi-Sensor Vision Measurement Systems, Image Dimension Measurement Systems, Optical Measuring Equipment, Seeing believes! We sincerely welcome the new clients abroad to build organization associations and also hope to consolidate the associations while using the long-established prospects.
Factory Price For Manual Vision Measurement Systems - Horizontal instant vision measuring machine – Handing Detail:

Model

HD-100H

CCD 20 Million pixel industrial camera
Lens Ultra-clear bi-telecentric lens
Light source system Telecentric parallel contour light and ring-shaped surface light.
Z-axis movement mode

3KG

Load-bearing capacity

Φ100mm(The measurable range is 100×75mm)

Visual field

±2μm

Repeatability accuracy

±5μm

Measurement accuracy

IVM-2.0

Measurement software It can measure single or multiple products at the same time
Measurement mode

1-3S/100pieces

Measurement speed

AC220V/50Hz,300W

Power supply

Temperature: 22℃±3℃  Humidity: 50~70%

Vibration: <0.002mm/s, <15Hz

Operating environment

35KG

Weight

12months

How long does your normal product delivery time take?

Assembly time: Linear encoders are in stock, 3 days for manual machines, 5 days for automatic machines, 25-30 days for large stroke machines.

Are your products traceable? If so, how is it implemented?

Each of our equipment has the following information when it leaves the factory: production number, production date, inspector and other traceability information.

What is your production process?

Receiving orders – purchasing materials – full inspection of incoming materials – mechanical assembly – performance testing – shipping.

What is the average lead time?

For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times become effective when (1) we have received your deposit, and (2) we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so.

What is the product warranty?

We warranty our materials and workmanship. Our commitment is to your satisfaction with our products. In warranty or not, it is the culture of our company to address and resolve all customer issues to everyone’s satisfaction.


Product detail pictures:

Factory Price For Manual Vision Measurement Systems - Horizontal instant vision measuring machine – Handing detail pictures

Factory Price For Manual Vision Measurement Systems - Horizontal instant vision measuring machine – Handing detail pictures

Factory Price For Manual Vision Measurement Systems - Horizontal instant vision measuring machine – Handing detail pictures


Related Product Guide:

We insist over the principle of enhancement of 'High high quality, Efficiency, Sincerity and Down-to-earth working approach' to offer you with superb assistance of processing for Factory Price For Manual Vision Measurement Systems - Horizontal instant vision measuring machine – Handing , The product will supply to all over the world, such as: Salt Lake City, Palestine, Lithuania, Custom orders are acceptable with different quality grade and customer's especial design. We are looking forward to establish the good and successful cooperation in business with long terms from the customers of all over the world.
  • This manufacturer can keep improving and perfecting products and service, it is in line with the rules of market competition, a competitive company.
    5 Stars By Marjorie from Liberia - 2018.02.21 12:14
    In general, we are satisfied with all aspects, cheap, high-quality, fast delivery and good procuct style, we will have follow-up cooperation!
    5 Stars By Pag from Muscat - 2017.09.30 16:36
    Write your message here and send it to us